Rosin plant Published by ENECA GmbH
Rosin plant
The project includes the construction of buildings and facilities needed for hard resin production that consists of:• Production and warehouse building intended for the production of solid resins (rosin pentaerythritol esters) and turpentine • Turpentine filling platforms (a canopy equipped with a device for bottom sealed filling of tankers; a mini fuel filling station in the metal box with a fuel filling nozzle) • A storage of liquid components (underground turpentine storage tanks (two tanks of volume 50 m3), an emergency drain tank, production engineering support structures (railway trays with pipelines for pumping turpentine from/into production) • A standalone gas process boiler with a steam generator and a thermal oil boiler • 10/0.4 kV transformer substation • MEP (Mechanical, Electrical, Plumbing)
Services
• Survey Works; • Environmental Protection and Ecological Passport development; • Environmental Impact Assessment; • Architectural Design; • Structural Design; • Construction Supervision.
Project information
Project's name
Rosin plant
Status
Completed
Construction time
01.01.2017 - 01.01.2019
Building type
7120 Industrial production sites
Specific BIM
BIM version
Big BIM
BIM-Cooperation
BIM mit REVIT
Software
-
Application
-
3D 4D 5D 6D 7D
LOD
-